  1. Board colours changed using a colour wheel

    The current layout of colours to choose from for the columns etc. is difficult to use as there is no logical order. Also, there is no way to add your own colours, such as with a colour wheel.
    Please change it so that you can choose colours using a colour wheel and with the colours arranged in an order that makes sense. It's driving me insane!

    32 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. CFD needs to show the entire board

    The CFD will only show one smart lane at a time. I would like to see all of the lanes at the same time and individually. My board has 36 smart lanes. I need to be able to see each smart lane separately and at the program level I need to see the cumulative status.

    25 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. add the optional ability to post backlog in a column on the visible board view

    On a physical kanban board, you can have an area to "display" the backlog along with the WIP which gives upstream and downstream stakeholders the ability to look into your backlog and see what you (or the operational review board) did not select for prioritizing. This is very often useful when not everyone who has a stake in your work can attend every prioritization meeting and you have a relatively high velocity and variable WIP flow.

    14 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. Blocked cards report

    I want to see a report of all blocked cards along with the blocking reason and the blocker's comment.
    I need to this report in order to identify quickly and easily which blockers i need to solve since not every blocked card means a problem.
    For example, in my project cards are blocked when their owner is on vacation.

    9 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. Read only access without using up licences

    We would like to share the project information sometimes with other stakeholders. To do this we would have to map them to one of the existing roles, but this eats into our available license pool. It would be nice if we could allow temporary read-only access for some users at a project level (probably using their email address as a logon).

    7 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. Task effort shouldn't have a unit of time associated with it.

    The tasks shouldn't be labeled with Days or it should be configurable.
    Maybe some tasks will take 30 minutes, some 2 hours and others will take 2 days.

    7 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. Add new role "Stakeholder"

    The "Stakeholder" role should be similar to the "Reader" role, but with one additional permission: "Stakeholders" are able to create cards and add them to the Backlog only.

    6 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    Hi Rodolfo,

    Thanks for your feedback.

    Do you see this as any issue in giving the ‘Member’ role to such stakeholders? If they can add cards to backlog, they might as well want to add it on the board for expediting the requests. But they’ll not be able to delete any.

    We’ll surely think over it and see if it’s a generic request for other users as well.

    -Swift-Kanban Team

  8. Project Status Visual

    Would it be possible to add a visual band or dot to see the project status (R/Y/G) on every card at a glance?

    6 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  9. add Pomodoro timer

    It would be very nice to have a pomodoro time like kanbanflow.com has

    5 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    Tom,

    Thanks for the suggestion. Yes, it would be a very nice feature. We are enable a basic time capturing in the coming release ad will explore if a pomodoro timer can feed the time capture.

    Let us know if you have any other feedback/ suggestions.

    -Swift-Kanban Team

  10. Functionality for cards in the Archive

    1. It would be great to be able to see card details in the archive
    2. Alternatively, It should be allowed to move cards back to the last column in a lane from the archive
    5 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    Hi Masa,

    1.Thanks for the feedback we added the feature request in backlog.

    2.For moving the cards from archive to last column we will request you to use the Add from Archive feature and move the card as required across board.

    -SwiftKanban Support

  11. Multiple rss links for status of your project and cards. Make this custumizable (filter like)

    Multiple rss links for status of your project and cards. Make this custumizable (filter like)

    5 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  12. Automatically move child card to Release & Sprint

    Business Problem:
    Identifying and moving every child card of an EPIC to Release/Sprint when the EPIC is already planned for a specific Release/Sprint.

    Use Case:
    1> An epic EPIC1, EPIC2, EPIC3 is created and planned for a Release ABC & Sprint PQR
    2> We start creating child cards UST1, UST2, UST3 under EPIC1. Similarly we add more userstories to EPIC2 and EPIC3
    3> After brainstorming we have added 10 Userstories to each EPIC. 4> Now we have Total 30 Userstories to be moved in Sprint PQR

    These Userstories should be automatically moved to Release ABC and Sprint PQR automatically as…

    5 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  13. Recurring Tasks/Cards

    Ability to add a task periodically like every week or month.

    5 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  14. TODO Tasks - allowing to add more details to the each TODO item

    TODO Tasks - allowing to add more details to the each TODO item.
    We would like to be able to use the TODO Tasks to log defects for cards currently being worked on instead of creating a separate Defect card and linking them to the card. This way we can keep our WIP limits lower as the TODO items wont affect the WIP limits and our board will not be cluttered with Defect Cards for items still in Development.

    3 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    Hi,

    Please can you elaborate more on the need as what more details are required on TODO for tracking .You also suggest you that we have TODO board to keep track of the TODO items separately for tracking and not affect the main Kanban board.

    -SwiftKanban Support

  15. Export/import feature improvement

    The export import feature is currently dreadful. Currently it exports date formats that are incompatable with import. This does not facilitate ease of use when attempting to move cards from one board to another. Either make card movement easier to do or fix the import/export feature.

    3 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    Hi Shon,

    We regret the inconvenience caused but can you please elaborate the issue a bit more?

    Are you saying that when you export cards to excel, it changes the date format and throw error while importing ? Ideally, it shouldn’t happen, unless there’s some setting in excel that’s messing it up.

    We’ll investigate this immediately and see if anything needs to be resolved.

    Thanks for trying Swift-Kanban. We’ll look forward to your reply to take this further.

    -Swift-Kanban Team

  16. Please add ability to interact with Graphic reports (like LeanKitKanBan) with sliders

    The ability to move a slider up and down the X or Y axis of any graph is a powerful way to view performance in the time frame or area of focus. it basically amplifies the signal to noise ratio - allowing users to focus on the specific behavior area of importance

    3 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  17. Upload cards that are in progress or already done

    Hello,
    from one year I'm using an Excel in order to maintain all my activities. Now I'm switching to SwiftKanban, but I'm not able to import all my cards that are started or completed.

    If I've understood well, SwiftKanban is able to import cards that are not started yet, but it's not possible to import cards that are in progress or already done.

    3 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    Hi Gavino,

    You can import the existing in-progress cards on the board directly by using the export/import option.Please add new cards directly and select any column on the board reflecting the card’s current status.
    Please note all the analytics will reflected the time from the day the cards are imported only.

    -SwiftKanban Team

  18. fix the pixel-positioning of the menus.

    When I go to ProjectName > Cards > Backlog, half the time I miss the Backlog and go right off the menu because the submenu that has Backlog etc. on it is too far below the top line of the Cards item.

    Both the menu and the submenu have a 7-pixel margin of dead space (counting the border and the margin), making it that much harder to select an item. In addition, the "Backlog" menu border is lined up with the active highlighted portion of "Cards", which means that if I put my mouse near the top of the word…

    3 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  19. make it so you can see boards that users are on.

    Allow me to see which projects people are working on by clicking on their name and then view. I am frequently asked by managers to "Just give them access to the boards I am on." However, I have not been able to figure out how to view which boards the managers are on to do so.

    3 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  20. Ability to change view or add a scroll bar when looking at child card hierachy

    Today, when you look at the child hierarchy for a card and the parent card has at least 10 child cards, there is no scroll bar to move up and down on the screen to view all the child cards. You have to try to drag the cards up or down to see them.

    2 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)