Ideas/ Suggestions
147 results found
-
Additional Columns for the Hierarchy Import Tool
It would be great if the following additional optional fields could be added to the Hierarchy Import Tool:
- Tags
- Description
15 votesHi Mark,
Thanks for the suggestion.We have added this request in the product backlog for prioritization. Will update you back in case if this is prioritized further.
-
Functionality for cards in the Archive
- It would be great to be able to see card details in the archive
- Alternatively, It should be allowed to move cards back to the last column in a lane from the archive
5 votesHi Masa,
1.Thanks for the feedback we added the feature request in backlog.
2.For moving the cards from archive to last column we will request you to use the Add from Archive feature and move the card as required across board.
-SwiftKanban Support
-
Feature improvement request: Timesheet
Hi,
Currently, the timesheet report (and its export) doesn't show the Action status such as Pending/InProgress/Completed. It will be extremely useful to add that data.Also adding the column info would be Very Nice to have.
Thank you.
0 votesHi Masa,
Thanks for the feedback.We have added this feature request in product backog for priortization.
-
Allow us to freeze the column headings when scrolling down the list of cards
when scrolling down a long list of cards, you lose the column headings. Allow us to freeze them like you can in Excel spreadsheets so you can always see the column name when scrolling to the bottom of the page.
11 votes -
How can cards be shared or pointed to between tables?
Let's say I have Table A with Card-W on it and that I have Table B. I want to be able to either see Card-W from Table B or have a card on Table B, let's call it Card-R, linked to Card-W.
How can I do that? In other words, I remember reading or hearing that Swift Kanban allows information to be shared between tables.
0 votes -
Lane description format is lost after saving
For a smart lane description (this may also happen with regular lanes). Type a description with a format such as the one bellow:
POLITICAS:
1. Debe ser revisada de inmediato por el PM or el DRI-Base para que él determine si de hecho se sigue considerando como express
2. El impacto económico negativo de hacerlo express es menor al impacto económico negativo de hacerlo no-urgenteDESCRIPCIÓN DE ESTE CARRIL:
Una tarea de clase express es aquella de carácter urgente. Puede ser por un motivo negativo (ejemplo, se cae el servicio) o positivo (algo nuevo que el cliente necesita e muy
…1 voteHi Masa,
This seems to be an issue and we have initiated a separate email thread for further analysis.
-SwiftKanban Support
-
Analytics improvements: Throughput
It will be extremely helpful to add on the graph a vertical line while doing mouse over that also displays the average throughput between starts day on the graph and the number of days pointed with the mouse-over
Also, It will be extremely helpful to add on the Throughput - Card Count header the Lane, Start column, End column. For example: instead or reading “Throughput - Card Count” it could read “Throughput - Card Count | Lane: UK Customer | From: Design | To: Internal Verification”
1 vote -
Add the ability to move a column under another
Currently, if you decide a column should be subordinate to another pre-existing column, you have to build out any splits/subordinates in the new hierarchy, then move cards, then delete the old column. Allow us to move the column as a subordinate/split under a preexisting column (with or without existing splits)
1 vote -
CFD needs to show the entire board
The CFD will only show one smart lane at a time. I would like to see all of the lanes at the same time and individually. My board has 36 smart lanes. I need to be able to see each smart lane separately and at the program level I need to see the cumulative status.
25 votesHi,
Please can you elaborate as what will the sequence in which the smart lanes will be displayed and do all the card moves accross this 36 smart lanes before arhcival.
-SwiftKanban Support
-
Recurring Tasks/Cards
Ability to add a task periodically like every week or month.
5 votesHi Rami,
Thank you for the feedback.We will work this suggestion and keep you updated on the progress
-
I need to see how many hrs. billing I have done on last couple of month on date basis like SAP. Is there any facility available?
like SAP, i would like to see how many hrs, billing i have done in last months, but it should be date wise and should show program name and hrs. booked.
3 votesHi Abdul,
For each Board we have Timehseet report which will provide you total hours entered against each card for particular duration.Please find the below help link for the same https://www.digite.com/knowledge-base/swiftkanban/article/view-reports/#Timesheet%20Report
-
More ways to update card position and assignee
There are many places to view card details, but few places to update the most important attributes -- Assignee, Position, and Title:
Linked cards diagram view
Bulk edit view (in linked cards diagram)
Linked cards tabular view (card > hierarchy > detail view in kanban board)
Card > all cards (or card types) tabular view
card details view (from linked card viewPlease allow me to update at least the card position(board/lane/column), assignee, and subject line.
...This is even more important in the table views where I might quickly update and assign child items of a specific effort hierarchy.
Without…
1 vote -
Upload cards that are in progress or already done
Hello,
from one year I'm using an Excel in order to maintain all my activities. Now I'm switching to SwiftKanban, but I'm not able to import all my cards that are started or completed.If I've understood well, SwiftKanban is able to import cards that are not started yet, but it's not possible to import cards that are in progress or already done.
3 votesHi Gavino,
You can import the existing in-progress cards on the board directly by using the export/import option.Please add new cards directly and select any column on the board reflecting the card’s current status.
Please note all the analytics will reflected the time from the day the cards are imported only.-SwiftKanban Team
-
DueDate performance in analytics
DueDate performance metrics is missing in analytics. This is one of the key metrics as per kanban method
1 voteHi,
Thanks for highlighting the metrics.We have added the feature requrest in backlog for priortization.
-
#noEstimates Kanban
In classical project management, you guess when features will be complete, promise the delivery date to the customer, and now that your scope and schedule are fixed, whip up the team to get the work done on schedule. As reality hits you in the face, you constantly shuffle features, or split features, to project a plan that you can meet. The constant re-planning is “waste” and the changing plan is disruptive.
In my favorite kind of Kanban, the teams work the backlog in priority order and use Lean and Agile techniques to push up their productivity. Strategic leadership is implemented…
1 vote -
ToDo List now showing tickets per person properly
Hi. I have a board with several users. When any user logs in as themselves and go to the ToDo list they all see my cards but not theirs even after filtering to request their own name only.
0 votesHi Masa,
Please can you let us know the board and user details.Also some screenshot will help us in analyzing the issue further.
-
Analytics: Cycle Time - ColumnWise Average Chart can't display all columns on board at once
I have a board with 4 swim lanes. If I select all of them to be displayed I can only see the first three. The fourth one cannot be access and the only way to get to it is by unselecting another one.
I'm using a MacBook Air with Sierra. Behavior is same on Safari, Chrome and Firefox.0 votesHi Masa,
Please let us know under which board and analytic component are you facing the issue.
-SwiftKanban Support
-
Allow swin lane policy banner to be displayed in full
Hi,
The swimlane policy banner text is truncated when it has large content. There's no way to show it all. Could you please make it's full display possible somehow? It could be a pop-up or other.
Thank you
0 votesHi Masa,
Thanks for the feedback we have added the request in product backlog for prioritization.
-SwiftKanban Support
-
Modal Forms
When create a new members, modal form not maximize or modified its size. Is not possible view all fields.
1 voteHi Vinico,
Thanks for the feedbaack.We have added this request on the product backlog.
-SwiftKanban Support
-
Analytics improvements: Flow Efficiency header
It will be extremelhy helpful to add on the header: Time Period, Lane, Start Column and End Column. Doing so reduces the need to look at the filter details. For example, instead of just reading "Flow Efficiency" it could read "Flow Efficiency | Daily | Lane: UK Customers | From: Ready | To: Done"
1 voteHi Masa,
Thanks for the feedback. We have added this request on the product backlog for prioritization.
-SwiftKanban Support
- Don't see your idea?